1. Level the underlying layer
When constructing, the ground needs to be leveled first. It is leveled by mechanical and manual cooperation. Before laying, the gravel and debris on the road surface should be cleaned to avoid tearing of the sheet during laying.
2. Tensioned geocell
When laying the geocell, it should be fully unfolded, that is, the honeycomb grid should be fully expanded and tightened to keep it in a complete honeycomb grid state, so as to give full play to the fixing effect of the sheet on the soil and vegetation; Fix one side with an anchor rod or other accessories on the top, and then slowly stretch it out, so as to maintain the stability of the geocell.
3. Geocell paving and rolling
After paving each layer of geocells, sand and stones should be filled in the holes to achieve locking and reinforcement. Vehicles must be used only after the cell grid is fully opened and the backfill soil is sufficient, so as to ensure the smooth progress of the construction. Compaction requires the use of vibratory rollers.